South Jordan, UT
General Contractor: Holder and Whiting Turner
Our team has completed three separate phased expansions at eBay’s South Jordan facility, serving as the mechanical and plumbing contractor. All three phases included significant cooling scopes along with very large custom supply air plenums.These expansions total more than 225,000 square feet.
Our scope of work:
West Jordan, UT
Project Owner/Client: Aligned Energy
General Contractor: JT Magen
Architect: HKS Architecture
Our team provided additional cooling capacity for critical data halls during this expansion to Aligned Energy’s existing facility. Several intricately planned shutdowns were required to tie the new system into the existing chilled water system.
Our scope of work:
Boise, UT
Project Owner/Client: Tonaquint
General Contractor: Russel Corporation
We used the design/assist approach to complete a 7,500-square-foot addition to one of Tonaquint’s data centers in Boise, ID. The primary system consisted of cutting-edge computer room air conditioner (CRAC) units.
Our scope of work:
West Jordan, UT
General Contractor: Holder Construction Company
Architect: Gensler
Mechanical Engineer: Syska Hennessy Group
Mechanical Engineer: Food Systems Design, Inc.
We provided HVAC and plumbing solutions for this project, serving as the mechanical contractor alongside Hill Mechanical Group. The total facility covered 235,000 square feet and included a 30,000-square-foot, mission-critical data center.
Our scope of work:
Salt Lake City, UT
General Contractor: Okland Construction Co., Inc.
Architect: VCBO
Mechanical Engineer: Smith Group
We helped consolidate seven data centers into a single, 74,000-square-foot computing and data storage facility for the University of Utah. The project featured highly advanced heating and cooling systems and achieved LEED Gold.
Our scope of work: